Herunterladen Diese Seite drucken

Werbung

EN
IMPORTANT
Please read these instructions carefully before you start to assemble this greenhouse.
Keep these instructions in a safe place for future reference.
a Customer Service
For assistance with assembly or for replacement parts – please log onto our website or call
our service line (number is on the title page).
www.palramapplications.com
Additional information can be found at our website: www.palramapplications.com
a Safety Advice
It is of utmost importance to assemble all of the parts according to the directions. Do not
l
skip any step.
We strongly recommend using work gloves during assembly.
l
Always wear shoes and safety goggles when working with extruded aluminium.
l
If using a step ladder or power tools ensure that you follow the manufacturer's safety
l
advice.
Do not touch overhead power cables with the aluminium profiles.
l
Do not attempt to assemble the greenhouse in windy or wet conditions.
l
Dispose of all plastic bags safely keep them out of reach of small children.
l
Keep children away from the assembly area.
l
Do not lean against or push the greenhouse during construction.
l
Do not position your greenhouse in an area exposed to excessive wind.
l
Do not attempt to assemble this greenhouse if you are tired, have taken drugs or
l
alcohol or if you are prone to dizzy spell.
Hot items such as recently used grills, blowtorches etc. must not be stored in the
l
greenhouse. Ensure there are no hidden pipes or cables in the ground before
inserting the pegs.
This product is designed to use as greenhouse only.
l
a Care & Maintenance
When your greenhouse needs to be cleaned, use a mild detergent solution and rinse
with cold clean water. DO NOT use acetone, abrasive cleaners or other special detergents
to clean the clear panels.
a Tools & Equipment
Tape measure
l
Work gloves
l
Plastic or rubber mallet
l
Lubricant
l
Phillips head screwdriver
l
Step ladder
l
Drill bit
l
Large hammer
l
Scissors
l
Spanner
l
T001
l
a Before Assembly
This is a multi-part assembly best achieved by two people.
Allow at least half a day for assembly process.
Selecting a site - the greenhouse must be assembeld,
positioned and fixed on a flat level surface.
Choose a sunny position away from overhanging trees.
We are strongly recomend to fix your greenhouse directly
to a solid concrete foundation. When doing that use the
pre drilled holes in the metal base supplied.
Take out all components parts of the packages. Sort the
parts and check against the contents parts list.
During assembly parts should be laid out close at hand.
Keep all small parts (screws etc.) in a bowl so they do not
get lost.
4 Prefix of the parts reference in the
assembly instructions:
A- Aluminum profiles and parts
P5XX– Polycarbonate panels
P3XX– Plastic parts
M– Metal parts
4XX– Screws, nuts, disks, etc.
TXX - Tools

Werbung

loading