Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance And Cleaning; How To Stock The "Master Unit; Disposal - AXITEC Master Unit Installationsanleitung

Batterie-absicherung für das pv-energiespeichersystem
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

AXITEC Energy GmbH & Co. KG
Otto-Lilienthal-Straße 5
71034 Böblingen, Germany
5.

Maintenance and cleaning

You should do a frequent short inspection of your Master Unit for keeping a long
durability and avoidance of an operational system's breakdown.
Please also consider your national standards and provisions regarding the
requirements of battery- and/or PV power installations and their equipment.
Potentially, you have to do an electrical test procedure once a year as it is to adduce
in some european countries, e.g. Germany.
Visual inspection
Depending on the installation side and the environmental conditions you have to
expect some pollution on the device's surface. Clean carefully with the help of a moist
cloth! During this time do not open the case of the device under any circumstances!
6.

How to stock the "Master Unit"

Demands:
dry conditions
ambient air temperature ranges from -25°C up to +55°C
for a maximum of 24 hours: temperature might get higher up to +70°C
7.

Disposal

Disposal is due to your national/local regulations. The Master Unit is to classify as
"electronic waste" (it is no "household waste"!)
Take care of that and protect the environment!
Page -8- of -10-
10011697_installation manual Master Unit_EN_V1.1

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für AXITEC Master Unit

Diese Anleitung auch für:

10011697

Inhaltsverzeichnis