AXITEC Energy GmbH & Co. KG
Otto-Lilienthal-Straße 5
71034 Böblingen, Germany
3.
Mounting the "Master Unit"
3.1 Selecting the mounting location
DANGER
risk of explosion or fire
●
do not mount the Master Unit on flammable construction materials!
●
do not mount the Master Unit near highly flammable materials!
do not mount the Master Unit in potentially explosive areas!
●
mount on a solid surface
the mounting location and method must be suitable for the weight and
dimension
the mounting location must be accessible at all times
climatic conditions must be in compliance with the specification
the device may not be exposed to direct sunlight and weather
the mounting location has to be protected against splashing water
installation position
Page -5- of -10-
10011697_installation manual Master Unit_EN_V1.1