Instructions for use
Manufacturer's specifications
The Duraklick fall protection system (HSS) has been ma-
nufactured by:
SOLTOP EU GmbH
Sonnenhalde 5
D-88161 Lindenberg
www.soltop.eu
The system has been tested and certified by the following
testing institute:
DEKRA Testing and Certification GmbH
Dinnendahlstr. 9
44809 Bochum
Identification plate information
Regular checks:
The system must be regularly checked and tested. For
this, our test report templates or testing app are used:
Acceptance protocol:
After installation of the HSS, this is used to check and
accept the system. The original remains with the opera-
tor; SOLTOP receives a copy by email.
- Inspection documentation:
This is used for the annual or biennial inspections. It is
created digitally by an approved inspector and handed
over to the operator with photos. SOLTOP receives a
copy by email and sends a sticker to the operator.
- Soltop EU has certified expert examiners for the PPE-
and the HSS fall protection system
Inspection intervals:
PSAgA...........................................every 12 months
harnesses, lanyards, fall protection runners,
Height safety device
HSS fall arrest system.................every 24 months
all components permanently connected to the Dura
klick mounting system
It has been installed by a company certified by SOLTOP
– in general, this will be a certified installer that has also
installed the photovoltaic system.
The HSS system is marked with an identification plate at
the system entry point nearest to the roof access. The
plate is shown below and contains the following informa-
tion:
The system must be subjected to re-
gular checks by a competent person
!
and these checks must be documen-
ted. This check is absolutely necessa-
ry, as the effectiveness and durability
of the system depend on it and thus
ATTENTION!
the safety for the user.
Acceptance protocol
Control list for assembly and approval of the horizontal Duraklick-HSS security system according to DIN EN 795:2012 Typ D+E.
Please fill in the positions accordingly and hand over the signed protocol to the system operator. Please mail a scanned copy to the res-
pective SOLTOP specialist. Attach the inspection sticker to the system.
Operator:
Projectnumber:
HSS-serialnumber:
Plantname / location:
Assembly company:
Adress:
Phone:
Certified fitter:
yes
Stop sign at the roof access
£
Type plate with serial number present
£
(indication of the maximum number of persons)
Gap width at butt joints max. 5 mm
£
Screw connections between system and fastening elements are
£
V2A / V4A and nuts are self-locking (Polystop)
All screw connections secured against loosening (1.5 - 2 thread
£
turns protruding)
Entry / exit openings available and self-closing
£
Overhang of the rail above the first / last
£
Single stop point maximum 300 mm
Constructive end stop / end stop (safety pins) at the end of the rail
£
end available (not applicable for revolving systems)
Rail free from dirt
£
System unit min. 3 x 4 modules with min. 480 kg
£
Trial inspection carried out
£
Rail course is straight
£
No interference with existing infrastructure (rail and runner do not
£
collide with other components)
Acceptance carried out by: __________________________________________ Date:
Signature:
__________________________________________ Date of next test: _____________________________
Acceptance protocol handed over to the operator _______________________
SOLTOP EU GmbH
Hauptsitz Schweiz:
Sonnenhalde 5
SOLTOP Schuppisser AG
D-88161 Lindenberg
St. Gallerstrasse 3 + 5a
www.soltop.eu
CH-8353 Elgg
www.soltop.ch
HSS
Mounting date of HSS:
Last test:
no
n/a.
note
£
£
£
£
£
£
£
£
£
£
£
£
£
£
£
£
£
____________________________
Sitz der Gesellschaft: Linden-
Handelsregister: HRB 14331
berg
MwSt: 127/137/60143
Registergericht: Kempten (All-
UID: DE300491338
gäu)Geschäftsführer: Andreas
EORI: DE314291943832627
Zimmerer
13