Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Commissioning - Stier Rw240 Betriebsanleitung

Doppel-rührwerk
Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 10
3

Installation and commissioning

3.1
Commissioning
Press the fuse switch first and then the start switch down
3.2
Operation of the mechanical speed controller
When the machine is in the STOP state, turn the rotary
switch to change the speed (see Fig. 2).
If you were not able to fully perform the speed change
by turning the rotary switch, first turn the shaft blades
slightly and then change the speed again via the
regulator.
3.3
Operation of the electronic speed controller
First, turn on the power button and then press the speed selection
wheel (which is located to the left of the power button) to reach the
desired speed (see Fig. 3).
CAUTION
Pay attention to the forces created by being trapped; hold the tool
firmly with both hands and assume a secure posture.
3.4
Installation
CAREFUL
Press the chuck down by hand (see Fig. 4).
Connect the stirring attachment to the collet (see Fig. 5).
And then let go of the hand again (see Fig. 6).
Fig. 4
STIER Industrial GmbH | Friedrichstraße 224 | 10969 Berlin | DE | info@stier.de
Fig. 2
Fig. 3
Fig. 5
Fig. 6
23
Inhaltsverzeichnis
loading

Verwandte Produkte für STIER RW240

Diese Anleitung auch für:

904613

Inhaltsverzeichnis