Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Selection Of Installation Equipment - Amzchef Fs-R55S-Prs01B Bedienungsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 5

Installation

Selection of installation equipment

1. Make sure the size of the ceramic cooktop (DxWxH): 590*520*50mm/23.23*20.47*1.97inch
2. Clean the countertop surface and make a proper cutout(DxW):
(562~564)*(493~495)mm/(22.12~22.20)*(19.41~19.49)inch
Kindly Note: For the purpose of installation and use, a minimum of 50mm space shall be
preserved around the hole. Be sure the thickness of the work surface is at least 30mm inch. Please
select heat-resistant work surface material to avoid larger deformation caused by the heat
radiation from the ceramic hob. As shown below:
1.97inch
Under any circumstances, make sure the ceramic cooker hob is well ventilated and the air inlet
and outlet are not blocked. Ensure the ceramic cooker hob is in good work state. As shown below:
Note: The safety distance between the ceramic hob and the cupboard above the ceramic hob
should be at least 760mm.
1.97inch
760mm
English
50mm min
20mm mini
Air intake Air exit 10mm
69
Inhaltsverzeichnis
loading

Inhaltsverzeichnis