Herunterladen Diese Seite drucken

Offgridtec MPPT Pro Duo Bedienungsanleitung Seite 28

Vorschau ausblenden Andere Handbücher für MPPT Pro Duo:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

offgnd
2. Installation
2.1 Warning
Be very careful when installing the batteries, especially flooded lead-acid battery. Please wear eye protection, and have
fresh water available to rinse if any contact with battery acid.
Keep the battery away from any metal objects, which may cause a short circuit of the battery.
Explosive battery gases any come out from the battery during charging, so make sure ventilation condition is excellent
For outdoor installation, keep out of the direct sunshine and rain infiltration.
Loose connections and corroded wires may result in high heat that can melt wire insulation, bum surrounding materials,
or even cause a fire. Ensure tight connections and use cable clamps to secure cables and prevent them from swaying
in motion.
The controller can work with lead-acid battery and lithium battery' within its control scope.
Battery connection may be wired to one battery' or a bank of batteries. The following instructions refer to a single battery,
but it is implied that the battery connection can be made to either one battery or a group of the battery bank.
Select the system connection cables according to the current density no greater than 5A/mm2.
General
information
Offgridtec GmbH
1m Gewerbepark
1 1
84307 Eggenfelden
WEEE-Reg.-Nr. DE37551136
Offgridtec
tec
Contact
Tel: 08721
9199400
Email: info@offgridtec.com
Web: wvm_offgridtec.com
CEO:
Christian
& Martin
MPPT Pro Duo
Account Sparkasse
Accoun
Nn: 10188985
BLZ
74351430
BAN:
DE69743514300010188985
BIC:BYLADEMI E GF(Eggenfelden)
Krannich
Ronal-Inn
Seat
and
district
HRB: 9179 Registergericht
Tax
Number.
Ust-ldNr
DE2871
Jurisdiction:
Seite
7 von
19
court
Landshut
141/134/30045
1 1500
Mühldoff
am
Inn

Werbung

loading