Herunterladen Diese Seite drucken

Offgridtec MPPT Pro Duo Bedienungsanleitung Seite 27

Vorschau ausblenden Andere Handbücher für MPPT Pro Duo:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

offgnd
4) Stop Charging Conditions
Condition
1:BATT2 stops charging when the
controller does not meet the charging condition.
Condition
2:BATT2 stops charging when BATTI
is not in float charging method, and the total
charging current for the battery is less than 2.5A
Condition
3: BATT2 stops charging when BATT2
reaches the "Full Charging Voltage."
CAUTION: Follow the stan charging
condition
to recharge
BATT2
turned
off.
5) Start Battery (BATT2) Charging Method
1.5 AES Signal
• The AES signal turns on after the BATTI voltage reaches the boost charging voltage
or equalize charging voltage in 5 mins.
• The controller will check if the BATTI voltage is lower than the boost charging
voltage or equalize charging voltage even,'5 mins (This value is AES signal tum off
delay time which can be set via PC software, default as 5 mins, range in O to 999
mins) , the AES signal control will be closed if it meets the conditions for 5 times.
NOTE:The max AES signal port and VCC shared power port are 5VDC/200mA
13mA during operation, and 4mA when it's off.
General
information
Offgridtec GmbH
1m Gewerbepark
1 1
84307 Eggenfelden
WEEE-Reg.-Nr. DE37551136
Offgridtec
tec
the BATT2 after the
Output
Port Instruction
Contact
Tel: 08721
9199400
Email: info@offgridtec.com
Web: wvm_offgridtec.com
CEO:
Christian
& Martin
MPPT Pro Duo
Charge voltage V
13.8
13
1
Account Sparkasse
Accoun
Nn: 10188985
BLZ
74351430
BAN:
DE69743514300010188985
BIC:BYLADEMI E GF(Eggenfelden)
Krannich
AES Signal
The MTI 1 power consumption
Ronal-Inn
Seat
and
district
HRB: 9179 Registergericht
Tax
Number.
Ust-ldNr
DE2871
Jurisdiction:
Seite
6
19
Time T
Time T
Refrigerator
is
court
Landshut
141/134/30045
1 1500
Mühldoff
am
Inn

Werbung

loading