Herunterladen Inhalt Inhalt Diese Seite drucken

Handing Over; Environment And Recycling; Guarantee - STIEBEL ELTRON HTE 4 Montageanleitung

Vorschau ausblenden Andere Handbücher für HTE 4:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
2.4.4 Mounting the front cover
HTE 4 A
a. Hook the button of the front cover onto
the front of the casing, and push top of
front cover towards the wall.
b. Push the locking bult upwards to secure
the case.
c. Fix securing screws.

3. Environment and recycling

Please help us to protect the environment by
disposing of the packaging in accordance with
the national regulations for waste processing.

4. Guarantee

For guarantees please refer to the pespective
terms and conditions of supply for your
country.
HTE 5 A
IV.
a. Push the outer casing over the body of the
unit until it touches the wall. Ensure that the
outer casing is square to the wall.
b. To lock the outer casing in position, lift the
casing slightly from the front, and push up
the locking bolt.
c. Fix securing screw.
The installation, electrical connection
and first operation of this appliance
should be carried out by a qualified installer.

2.5 Handing over

Hand over the operating and installation
instructions to the user. Explain the functions
of the unit and ensure that the user pays
particular attention to the safety instructions.
The company does not accept
liability for failure of any goods
supplied which accor-dance with the
manufacturer's instructions.
27

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Hte 5

Inhaltsverzeichnis