Herunterladen Inhalt Inhalt Diese Seite drucken

TOOLPORT WIKINGER MARINE Anleitung Seite 12

Pvc-zelt + sturmset 3,5 x 8,4m
Inhaltsverzeichnis

Werbung

GB
Instructions - Step 1
Select a flat surface for the tent. Unpack the boxes and check if all listed parts are included. Remove the slight oil film from the
pipes with a cloth. In colder weather conditions we suggest to bring the roof to room temperature before installing.
Make sure that the wing nuts are always facing the inside when assembling.
1
Place the triangular arches (6) as shown on the ground.
2
Connect the triangular arches with the roof struts (13 und 14). Make sure that 14 is the last strut.
3
Now connect the roof bar (7) with the roof arch (6) and screw the roof strut (8) together with the roof bar (7).
Use the screws (24) and the wing nuts for this (26).
4
Connect the side arches (3) with the roof bar (7).
At least one person should hold the frame upright.
5
Now connect the side arches (3) with the side struts (13 and 14) using the screws and nuts (24 and 26). Make sure that the last
strut used is always 14. Close the endpipes 13 and 14 with the corresponding plastic caps (35). Connect the diagonal strut (12)
with the side strut.
6
Put the middle leg (9) in the side arch (3). Now join the diagonal struts (12) and the side struts (13 and 14).
7
Secure the frames accordingly and put the lower leg (10) in the middle leg (9) and connect it with the diagonal strut (12) and
with the side strut (13 and 14).
Instructions - Step 2
1
Assemble all of the connecting frames accordingly.
Caution: the frames vary (see design)
2
Now assemble the frames individually on the finished sections with the side struts (13). For this step you will need ladders and
several persons. Please, use only the side strut (13) for connecting the next section.
3
Repeat position 2 with all frames and follow exactly the construction and correct order (see position 1). Use the diagonal strut (12)
as described in section 1.
4
Fix the frame with the tensioners (16,18).
Make sure, that the legpipes are in vertical position, to avoid overtention on the enwalls.
5
Connect the feet in the lower part of the legs and secure the frame with ground pins 20 and ground pins 31 on the ground.
If necessary, use the ground clamps.
6
Pull the tarpaulin over the frame.
Pay attention especially to the edges and corners of the frame to avoid damaging the tarpaulin.
7
Push the tension bars (15) in the provided pockets and use the fasteners. Fasten the roof with the ratchet straps (28) to the
screw hooks (29). Assemble the gable walls with the elastic rings (22).
® ®
12

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis