4.4 Connecting the Battery to the Inverter
Danger to life due to burns caused by electric arcs through short-circuit currents
Short-circuit currents in the battery can cause heat build-up and electric arcs . Heat build-up and electric arcs
may result in lethal injuries due to burns .
Disconnect the battery from all voltages sources prior to performing any work on the battery .
Disconnect the inverter from all voltages sources prior to performing any work on the inverter .
DANGER
DO NOT short-circuit the battery terminals . First, complete the main negative terminal connection between
battery and inverter, and then complete the main positive terminal connection between battery and inverter .
Observe battery safety information provided in the Safety and Installation Instructions .
Inverter side
Bat+
Bat-
INV
BAT
1
2
BAT
BAT
3
5.0 Communication Connection
5.1 Wi-Fi Module Connection
1 .
T20
T20
6.0 Installing the Side Cover
1 .
2
2
1
Before turning on power, ensure that all the electrical connectors are correct and reliable .
DANGER
7.0 Commissioning
To set up the inverter as part of a SunPower Reserve installation, follow the commissioning steps as outlined in the Reserve Safety
and Installation Instructions .
8.0 System Power ON / OFF procedure
Ensure a reliable and correct installation and electrical connection before power on .
DANGER
Power ON procedure
1 .
Switch ON the BATTERY SYSTEM ISOLATOR which is at the lower left side of the inverter .
2 .
Switch ON the BATTERY CIRCUIT BREAKERS of all batteries which are at the lower left of the batteries .
3 .
Switch ON the AC GRID SUPPLY to the inverter .
4 .
Switch ON the AC BACKUP SUPPLY from the inverter if installed .
5 .
Switch ON the PV switch (if there is any) between the PV strings and the inverter .
6 .
Switch ON the PV ISOLATOR on the left side of the inverter immediately below the Wi-Fi port, if PV arrays are connected to
inverter directly .
7 .
Switch ON the AC breaker (if there is any) between the PV inverter and the grid .
Power OFF procedure
1 .
Set the Changeover switch to MAINS to supply loads from the GRID, if installed .
2 .
Switch OFF the AC BACKUP SUPPLY from the inverter if installed .
3 .
Switch OFF the PV switch (if there is any) between the PV strings and the inverter .
4 .
Switch OFF the PV ISOLATOR on the left side of the inverter, immediately below the Wi-Fi port, if PV arrays are connected to
inverter directly .
5 .
Switch OFF the BATTERY CIRCUIT BREAKERS of all batteries which are at the lower left of the batteries .
6 .
Switch OFF the BATTERY SYSTEM ISOLATOR which is at the lower left of the inverter .
7 .
Switch OFF the AC GRID SUPPLY to the inverter .
8 .
Switch OFF the AC breaker (if there is any) between the PV inverter and the grid .
For more information, refer to the Safety and Installation Instructions .
Battery side
BAT-
PE
BAT+
(INV)
(INV)
(INV)
Terminal
BMS
BMS Communication Cable
Resistor
1
2
3
4
Disassembling the BAT power connector for series batteries
1
2
Notes:
Normally, the BAT main negative cable connecting the BAT-
connector of the last series battery and inverter will be too long .
First wrap the cable and then tie it to the bottom left behind the
bottom battery .
2 .
2 .
5.2 Other Communication Connection
AUX / LAN / DRM&RRCR / Meter / RS485 / BMS Connection:
BMS
(INV)
Keep the screws on
the COM connection cover
Item
No.
1
BMS
NC
RS485
12V
METER
NC
DRM
DRED1/5
RRCR
K1
AUX1
DO1_NO
AUX2
DO2_NO
RJ45 Plug
Wiring the Communication Cables to the Inverter
T20
M4*10 (x2)
1.6Nm
9.0 Installing and Disassembling the Cable Cover
Make sure all the wiring is secure and the system is working normally and then install the cable cover on the left side of the inverter .
T20
1.6Nm
9.1 Installing the Cable Cover
1 .
Plier
Detailed steps:
1 .
Cut cable holes based on the PV and AC cabling routing, and route the cables through the cable holes .
2 .
Align the holes on the right side of the cable cover to the hooks on the left side of the front cover, downwards push the cable
cover along the edge of the front cover .
9.2 Disassembling the Cable Cover
1 .
≈5mm
Refer to Safety and Installation Instructions to commission the whole system .
Disclaimer:
This Quick Installation Guide is not replacing Safety and Installation Instructions, it is a short introduction to the
product installation . The reference remains the Safety and Installation Instructions .
CAUTION
NEED MORE HELP?
If you would like to contact us directly, please visit our official website:
https://sunpower.maxeon.com
Safety and Installation Instructions for SunPower Reserve
T20
M4*10
1.6Nm
2
3
4
5
RS485_A4
NC
CAN1_H
CAN1_L
DEBUG_
GND
RS485_B5
RS485_A5
RXD_COM
NC
RS485_A7
NC
NC
DRED2/6
DRED3/7
DRED4/8
REFGEN/0
K2
K3
K4
3 .3V
DO1_COM
DO1_NC
DI_
DI_POSITIVE
NEGATIVE
DO2_COM
DO2_NC
DI_
DI_POSITIVE
NEGATIVE
AUX
RJ45 Plug
2
4
6
1
3
5
T568B
T20x150mm
1.6Nm
2 .
2
1
for more information .
6
7
8
NC
RS485_B4
NC
NC
DEBUG_
NC
TXD_COM
RS485_B7
NC
NC
COMLOAD/0
NC
NC
NC
GND
GND
0 .5mm²
F1
1
2
3
T20
1
2

Werbung

loading