Herunterladen Diese Seite drucken

GARDY SHELTER CCP-MOD 553540 3860 Aufbauanleitung Seite 40

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 46
ENGLISH
CODES
PART DESIGNATION
M
Bitumen felt strips
P
Bitumen felt fixing strip
P1
Bitumen felt fixing batten
Q
Batten under the battens
Lay the bitumen roofing felt (part M). Handle it with care (preferably with gloves) so as not to
tear it. First cover the 2 ends (front and back) and work towards the middle of the roof
making sure to overlap each previously laid strip. Then nail the (P-pieces) to the edges
of the strips, using SC1 screws. Fix the battens under the roof boards (Q-pieces) with SC1
screws by folding the felt under the boards see detail drawing. This prevents the felt from
tearing and provides a good underlay for the roof waterproofing.
FITTING OF FINISHING PIECES
N1
N
CODES
PART DESIGNATION
N
Edge board
N1
Side board
N2
Side board
Continue by fitting the front and rear Side boards (N pieces) and the (R-pieces), using SC2
screws.
N2
DIMENSIONS (MM)
Rolls 5,8 m
40 x 15 x 2598 mm
40 x 15 x 1931 mm
40 x 15 x 2900 mm
N1
DIMENSIONS (MM)
20 x 110 x 2920 mm
20 x 110 x 2623 mm
20 x 110 x 1942 mm
QTY
5
7
7
65
N2
QTY
2
2
2
40

Werbung

loading