SUMMARY
6. operate cylinder (Fig. 160 ref. 1), supplying it with compressed air, and make sure its stroke is included between 5 - 10 mm (0.2 - 0.04");
7. blow off cylinder and make sure the arm (Fig. 161 ref. 1) can slide freely in its guide (Fig. 161 ref. 2);
8. repeat points (6) and (7) 3 times at least.
EN_104
7105-M019-00
KENDO - KENDO.EVO
Fig. 160
Fig. 161