Herunterladen Diese Seite drucken

Axis Communications P5522 Installationsanleitung Seite 10

Vorschau ausblenden Andere Handbücher für P5522:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50
Page 10
4. Route and connect the network cable and the multi-connector cable, if applicable, to the
network camera. Be careful not to damage the cables when connecting them. Make sure the
foam gasket holes are aligned with the cable tracks and, if applicable, remove the cut-out piece
for the multi-connector cable from the foam gasket.
5. Put the camera base lid back in its original position and fasten the screws.
6. Secure the camera using the supplied safety wire.
7. Slide the unit holders on the network camera into the slots on the mounting plate and rotate
the camera unit.
8. Install the High PoE Midspan 1-Port, see Install the AXIS T8123 High PoE Midspan 1-port, on
page 13.
9. Check that the indicator LEDs on the midspan indicate the correct conditions, see the table on
page 23 for further details.
Drop ceiling mount
1. Remove the ceiling tile in which the drop ceiling mount is to be fitted.
2. Use the supplied template to mark the position for the 210 mm (8.3 in.) hole in the ceiling tile.
Cut around the template.
Notes:
• The combined weight of the camera and ceiling mount is approximately 2.3 kg (5.1 lb.). Check
that the ceiling material is strong enough to support this weight.
• The ceiling tile should be 5 mm–60 mm (0.2 in.–2.4 in.) thick.
3. Assemble the ceiling bracket.
4. Put the ceiling bracket into the ceiling tile, see illustration on page 11.
5. Tighten the bracket arm screws using a torx 20 screwdriver head.
6. Loosen the 4 camera base lid screws and remove the camera base lid, see illustration on page 7.
AXIS P5522 Installation Guide
Ceiling tile
Hole diameter
210 mm (8.3 in.)

Werbung

loading