Herunterladen Diese Seite drucken

O'Clair BLOM200 Bedienungsanleitung Seite 27

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

HEAT PUMP
1. INTRODUCTION
IMPORTANT
We kindly request the client or installer to read this manual carefully in order to:
Complete a correct installation and start-up.
Be familiar with all the potentialities of the unit and to take into account all the necessary circumstances for
its correct and lasting operation.
2. ADDITIONAL RECOMMENDATIONS.
Pressure Equipment Directive (PED-97/23/EC)
A. Installation and maintenance
• Heat sources • Flammable materials • Building air intakes

Werbung

loading