Herunterladen Diese Seite drucken

Cedes cegard/Lift LX Betriebsanleitung Seite 18

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

cegard/Lift LX/LY
6.9.
Example 1 with cegard/Lift LY: Bypassed light curtain with dropped-out (released) latch so-
lenoid actuation
This example shows a simple variant, illustrating how the cegard/Lift LY can be integrated in a system without
premature door opening.
Important safety notice:
Mains power must also be available during a safety circuit interruption. Internal call signals (Innenrufe) must also
be possible during a safety circuit interruption.
Cross reference: See section 3.3.3 for timing diagram
inside calls or
reset button
Innenruf / Reset
Bezugspotential
door lock signal
latch solenoid
P
N
power
supply
PE
Figure 22: Connection diagram without premature door opening
18
to the elevator controller
+
-
K40
K41
K42
K43
snap-rail
www.cedes.com
Installation and Operation Manual
Diagnose
Bündigstellung
Überbrückungsverzögerung
Sicherheitskreis
Power
Servicetaste
K1
+ Notstop
K2
- Notstop
K3
Check 1 Riegel
K4
Check 2 Riegel
K5
Check 1 Sicherheitskreis
K6
Check 2 Sicherheitskreis
K7
K8
K9
K10
Innenruf 1-8
K11
K12
K13
K14
K15
Innen-Ruf Common
+ Option1
K16
- Option1
K17
+ Option2
K18
- Option2
K19
+ Bündigstellung
K20
- Bündigstellung
K21
+ Überbrückungsverzögerung
K22
- Überbrückungsverzögerung
K23
+ Riegel_in
K24
- Riegel_in
K25
K26
Riegel_out
K27
K28
Sicherheitskreis1
K29
K30
Sicherheitskreis2
K31
P
K32
N
K33
K34
Auswerteeinschub
cegard/Lift
© CEDES/August 2013

Werbung

loading

Diese Anleitung auch für:

Cegard/lift lyCegard lift lx