INSTALLATION OF THE SUPPORT BOX
It is necessary to excavate foundations of the dimensions indicated in pic. 2.
To avoid any risk of settling in the foundations it is recommended that the surface bearing
the support box be consolidated using quick-drying cement.
The support box must be set level in the excavated area. Ensure that the centre of the
pinion is perfectly aligned with the axis of rotation of the door (pic. 4).
FITTING THE DOOR
Before installing the door, ensure that the cement in the foundations has hardened.
A - Form the gate guide slot as follows:
- take a channel
- position the bush on the channel, using the axis of rotation of the door as a reference
(pic. 4)
- turn the grooved bush so that one groove coincides with the axis of the channel
- carefully weld the bush to the channel (pic. 4)
- close the channel on the pillar side, by welding on a plate
B - Lubricate the support box pinion using grease.
C - Insert the guide slot on the pinion (pic. 4).
D - Rest the door of the gate on the guide slot and connect it to the top hinge.
Under no circumstances must the door of the gate be welded to the guide slot or directly
to the grooved bush.
FITTING THE OPERATOR
- Open the door to its fullest extent.
- Insert the grooved connection bush on the support box pinion.
- Insert the operator into the support box and couple the pinion on the operator to the pinion
on the box using the grooved connection bush.
- Unlock the operator and open/close the door manually to check the system is operating
correctly.
- To limit the stroke of the operator, use the stroke adjustment screws. Each of these
screws reduces the stroke by between 0° and 30°.
The more they are turned in a clockwise direction, the more the stroke of the operator is
limited.
Measurements in mm
2
BLEEDER SCREW
3
13
Measurements in mm
POSITION FOR THE
MANUAL LOCK RELEASE
EXTERNAL
INTERNAL
RELEASE
STROKE ADJUSTMENT
G
B
4
5
6
7
8
Inhaltsverzeichnis
loading

Verwandte Produkte für Fluid R - DVI Serie

Inhaltsverzeichnis