Herunterladen Diese Seite drucken

Eibenstock BST 102/53 Originalbetriebsanleitung Seite 13

Diamantbohrständer

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

All manuals and user guides at all-guides.com
After each readjustment always check that the screws are tightly
fixed so that safe operating of the drill rig is possible.
Mounting the turnstile
Mount the turnstile (1) on the
right or left side of the carriage
(2) depending on the work to be
performed.
Check whether the turnstile (1) is
fixed tightly.
Fastening of the Drill Rig
Fastening by means of dowels in concrete
Use
For brickwork, Rawl-Dowels
must be used.
Mark the position of the drill holes for the fastening
on the surface to be drilled.
Drill a hole (Ø 15) 50 mm deep (A), into which the
dowel M12 (B) is to be placed; insert and secure
the dowel with the doweling tool (C).
Screw the quick action clamping screw (D) into
the dowel.
Install the drill rig.
Fix the washer (E) and finally the fastening nut
(F) on the quick action clamping screw (D).
Tighten the fastening nut (F) with a wrench
SW 27.
Before and after tightening the nut (F), the 4
adjustable screws have to be adjusted in order
to adapt the rig to the surface.
Do check whether the drill rig is
installed safely and firmly.
2
13
Klick

Werbung

loading

Diese Anleitung auch für:

Bst 103/53Bst 102/60Bst 103/60