Herunterladen Inhalt Inhalt Diese Seite drucken

Aseko Probe CLF Bedienungsanleitung Seite 9

Vorschau ausblenden Andere Handbücher für Probe CLF:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Calibration
Having been inserted into the fl ow well and
commissioned, the probe is being stabilised for
approx. 1 hour.
Calibration must be performed after 24 hours.
It is recommended to calibrate the probe to the
concentration level that is maintained by the
automaton.
Perform calibration under stable conditions.
Electrolyte Filling
Fill the CLF (# 12029) probe membrane module
with the original electrolyte (# 12071) up to the
mark.
Membrane module screwing
Grasp the module so that you cover the membrane
with your fi nger (the fi nger must be clean, free of
grease) at the module bottom.
While carefully screwing the module into the probe,
you feel the probe tip pushing the membrane.
Until screwing is fi nished, keep on holding the
membrane with your fi nger to prevent the membrane
from being damaged by pressure of excess air and
electrolyte fl owing o through a microscopic hole in
the membrane.
EN
9

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis