Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Power Supply - Monarch EcoSalt BMSC Handbuch

Serie eco-salt. desinfektionssystem unter verwendung des salzwassers, natürliche lösung für schwimmbecken und bäder
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 15
INSTALLATION INSTRUCTIONS FOR ECO SALT BMSC

INSTALLING THE POWER SUPPLY:

Select a convenient well-ventilated location within one metre of filter equipment and
mount the Power Supply vertically onto a post or wall 1.5 metres above ground level.
There is one hole in the top of the unit and one in the bottom to facilitate installation.
Australian Standards requires that the Power Supply shall not be located within 3 meters
of the pool water. Plug Power supply into a suitable weatherproof outlet and plug pump
into power outlet of the Power Supply Unit. The Unit must be kept away from acid and
other chemical storage areas. Acid and chemical vapours will corrode the electronics
inside the Unit. It must also be kept away from heat sources. Good ventilation is
necessary for correct operation (See diagram at bottom of page).
CONNECTING THE ELECTROLYTIC CELL TO THE POWER SUPPLY:
The BMSC Power Supply is fitted with a flexible lead terminated with connectors. These
must be correctly fitted to the connections on the underside of the Cell. Fit black
connectors to the outer titanium rods. Fit the white connector the middle titanium rod.
The Blue Flow Sensor should be pushed onto the thread of the small threaded bolt on
the top of the cell.
The power outlet on the bottom of the Power Supply (not on all models) is dedicated to
the POOL PUMP ONLY. Do not use a double adaptor to connect more than one pump -
it can cause overload to the system and could void your warranty. Important: The Cell
has to be connected as shown.
Note: The bolt included in one of the adaptor to cell is to make a connection to an
independent earth. Refer to installation drawing- Para.9.
PRE - START UP PROCEDURE:
Before operating your Eco Salt® ensure the following items have been added to your
pool:
• SALT - Load salt into the pool at a minimum rate of 40kg per 10,000 litres (0.4%).
Connect vacuum system and slowly vacuum until salt dispersal is complete. Place
vacuum head into deepest end of pool and allow vacuum to continue for a further 2 or 3
hours. Salt should now be completely mixed.
• CHLORINE - For a new pool installation that has not been chlorinated, add sufficient
Chlorine (liquid or granular) to achieve a reading of 3 ppm (with a suitable test kit), or run
the chlorinator system continuously for at least 24 hours or until a reading of 3 ppm is
reached.
• STABILISER - It is essential that pool stabiliser be added and maintained at the rate
of 30 - 50 mg/l (30 - 50 ppm) at all times. Do not exceed 100 ppm.
Page 5 of 93
13/02/2008

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis