Herunterladen Diese Seite drucken

Toolson PRO-AS 18 Li Originalbetriebsanleitung Seite 11

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Anleitung_PRO_AS_18_Li_SPK7:_
Sound and vibration
Sound and vibration values were measured in
accordance with EN 60745.
L
sound pressure level
pA
K
uncertainty
pA
L
sound power level
WA
K
uncertainty
WA
Wear ear-muffs.
The impact of noise can cause damage to hearing.
Total vibration values (vector sum of three directions)
determined in accordance with EN 60745.
Drilling in concrete
Vibration emission value a
≤ 2,5 m/s
h
K uncertainty = 1,5 m/s
2
Screwing without hammer action
Vibration emission value a
≤ 2,5 m/s
h
K uncertainty = 1,5 m/s
2
Additional information for electric power tools
Warning!
The specified vibration value was established in
accordance with a standardized testing method. It
may change according to how the electric equipment
is used and may exceed the specified value in
exceptional circumstances.
The specified vibration value can be used to compare
the equipment with other electric power tools.
The specified vibration value can be used for initial
assessment of a harmful effect.
Keep the noise emissions and vibrations to a
minimum.
Only use appliances which are in perfect working
order.
Service and clean the appliance regularly.
Adapt your working style to suit the appliance.
Do not overload the appliance.
Have the appliance serviced whenever
necessary.
Switch the appliance off when it is not in use.
Wear protective gloves.
18.10.2010
9:27 Uhr
Seite 11
Residual risks
Even if you use this electric power tool in
accordance with instructions, certain residual
risks cannot be rules out. The following hazards
may arise in connection with the equipment's
construction and layout:
69.4 dB(A)
1. Lung damage if no suitable protective dust mask
3 dB
is used.
2. Damage to hearing if no suitable ear protection is
80.4 dB(A)
used.
3 dB
3. Health damage caused by hand-arm vibrations if
the equipment is used over a prolonged period or
is not properly guided and maintained.
5. Before starting the equipment
Be sure to read the following information before you
use your cordless screwdriver for the first time:
2
1. Charge the battery pack with the charger
supplied. An empty battery pack requires a
charging period of approximately 3 hours.
2. Only ever use sharp drill bits and screwdriver bits
2
which are suitable for the purpose and in
faultless condition.
3. Always check for concealed electric cables and
gas and water pipes when drilling and screwing
in walls.
6. Operation
6.1 Charging the LI battery pack (Fig. 2-3)
1. Remove the battery pack (5) from the handle,
pressing the pushlock buttons (8) downwards to
do so.
2. Check that your mains voltage is the same as that
marked on the rating plate of the battery charger.
Insert the power plug of the charger (6) into the
mains socket outlet. The red LED will shine.
3. Push the battery onto the battery charger. The
red LED will flash. After approximately 4 seconds
the red LED will shine and the green LED will
start to flash to indicate that the battery pack is
being charged. When the charging process has
finished, the red LED will go out and the green
LED will begin to shine. The time it takes to fully
recharge an empty battery is approximately 3
hours. If the red LED on the charger flashes for
longer than 4 seconds, the temperature is either
above or below the perfect charging temperature.
In this case, pull out the plug of the charger and
charge the battery in an environment in which the
temperature is either warmer or cooler. If the red
and green LED flash at the same time, the battery
GB
11

Werbung

loading

Diese Anleitung auch für:

45.132.55