Herunterladen Diese Seite drucken

LEGRAND 24V Installationsanleitung Seite 12

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 22
5. Connect the battery charger to the battery bank through the DC cable L1 or L2 (picture 4,5).
Picture 4 - KEOR LP
6. Ensure the installation is safe for the final user applying to the battery cabinet terminal block
insulating cover and cables glands.
7. Plug the power cable to the AC mains socket.
8. Switch on the battery banks breakers.
9. Turn on the mains that supply UPS, battery banks and battery chargers.
CAUTION
Before to uninstall the battery charger switch off the mains and the battery banks and ensure
no dangerous voltage is present in the terminal block. No matter the charger is connected to
the utility or not, the output may have electricity
12
3 Installation
Picture 5 - DAKER DK

Werbung

loading

Diese Anleitung auch für:

36v48v72v