3 Installation
Package Contents
* Cable type L1 +A3 : used to connect Keor LP , it is inclueded only in the references 310958,310960,310961
* Cable type L2 +A2 : used to connect Daker DK, it is included only in the references 310959,310961
Wiring installation guide
CAUTION
Only a licensed and expert electrician is authorized to install the Battery Charger BOX.
Picture 1
Picture 2
Make sure +/- wires position is correct (not reverse no short circuit).
CAUTION : tighten screws to avoid electric arc.
CAUTION : fix L1/L2 to the charger box through the cable ties (A4).
CAUTION : Assembly the terminal cover and fix it to the charger box by screw (picture 3).
Battery Chargers 24,36,48,72V
Picture 3
1. Switch off all the power sources that supply
UPS, battery banks and chargers. Ensure that
the Battery Charger is unplugged.
2. Turn off the battery banks breakers.
3. Remove the terminal cover by means of a
screwdriver (picture 1).
4. Connect the battery cables (L1 for DAKER DK
range or L2 for Keor S range) to the battery
box terminal (picture 2).