Herunterladen Diese Seite drucken

patura 434650 Bedienungsanleitung Seite 13

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

8 Apply the pipe glue to the riser tube and glue into the fitting in the bottom of the base.
Ensure all connecting points are clean.
9 Push the riser pipe into place so the 3/4" pipe fittings come through the hole in the riser pipe.
Make sure to push the T-fitting in the lateral opening at the riser pipe.
10 Apply thread sealer or Teflon tape to the threads on the valve (don`t glue them!)
11 Screw the valve in tight against the riser pipe. Hand tight should be enough.
Attach the float assembly to the lower arm of valve using the 1/4" thumb screw in the parts
bag. Place drain plugs in drain holes from the inside only. Place balls in bottom of waterer`s
base, begin filling. Install top of waterer to base with 4 screws.
12 The final adjustment should be made through access post in the top. Proper water level is achie-
ved when ball just touches the underside of the lid. Leaving them a little loose is recommended.
Installation sketch
The following material is required but not supplied in the kit of the Farmdrinker:
· Concrete to build a concrete platform
(approx. size: 15 cm thick / each side should be 30 cm wider than the waterer itself)
· Thread sealer or teflon tape
Install your water supply line at minimum 30 cm below the frost depth to ensure frost free
operation. Place the water supply line so it comes up close to the center of the shaft, to the
upper side of the concrete platform.
Ground Level
Insulation
(supplied)
3/4" supply line
Min. 30 cm Ø
Insulation
Horizontal, flat
concrete platform,
approx. 15 cm thick
Frost depth
+ 30 cm
61.6 cm
20.3 cm
55.9 cm
13

Werbung

loading