3.3 Preparation of facility
Remove the dryer from the pallet. Ensure that the floor of the facility can withstand the
weight of the dryer. Install the dryer on a level surface that is able to bear its weight.
Regulate the horizontal axis of the dryer using a leveling instrument. The gradient from the
horizontal surface must not exceed 3
cannot permeate. Choose a facility for installing the dryer with a minimum level of dust.
Install the dryer at least 1.5 m from a wall. A minimum 0.5 m should be allowed between
the rear side of the dryer and a wall. The facility in which the dryer is installed must be good
ventilated or fitted with a combined extract-and-input ventilation system.
3.4 Preparation of compressed-air line
Connect the dryer to the compressed-air line. Provide the throughput capacity of the
compressed-air line in accordance with the capacity of the dryer.
COMPRAG RDX series compressed air refrigerated dryer
. Install the dryer in a facility in which precipitation
0
All components of the compressed air line must have a working
pressure no less than the dryer's nominal pressure.
Connection symbols
IN
OUT
15