Herunterladen Inhalt Inhalt Diese Seite drucken

Wiring; You Should Definitely Use An Earthed Line For The Product; Gas Connection - Kuppersberg FS 604 Technischer Pass

Einbau-gaskochfeld
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

TECHNICAL PASSPORT
Built-in gas hob

2.3 Wiring

You should definitely use an earthed
line for the product!
The manufacturing firm shall not be
responsible for any damages that may occur if
the product is used without the earth.
ОElectric shock, short-circuit or fire risk
arising from the installation performed by any
unprofessional persons! The product should be
connected to the mains only by an authorized
and qualified person and the warranty of the
product starts only after correct installation.
Power shock, short-circuit or fire risk
arising from damaged power cable! The power
cable should be crushed, crinkled or pinched
or should not contact with the hot parts of the
product. If the power cable gets damaged, it
should be replaced by a qualified electrician.
The mains supply data should be
same on the data indicated on the nameplate
of the unit. You may find the nameplate at the
back of or under the product.
The
connection
product should comply with the technical
specifications and power consumption.
Risk of electric shock! Before performing
any work on the electric installation, please
disconnect the power supply of the product.
30
and systems should be performed by
qualified and authorized persons.
conditions of local distribution (gas type
and gas pressure) comply with the settings
of the product.
pressure-reducing valve you use on the
range are safe. Connect the gas delivery
hose with the hose behind the range and
tighten it by using a clamp and screwdriver
(figure 10). Make sure it is firmly tightened.
should not be longer than 1500mm.
reducing valve to be used for LPG should be
300mmSS and certificated.
cable
of
the
through the hot part behind the equipment.
Temperature of the gas hose should not
exceed 90°C (degree).
not leak any gas.

2.4 Gas connection

 Any work on the gas equipment
 Prior to installation, make sure the
2.4.1 LPG connection
 Make sure the gas hose and gas
 Gas delivery hose of the equipment
 The pressure of the pressure-
Gas delivery hose should not pass
Prior to use, make sure the system does
1.
G1/2 Nipple)
2.
Silicon seal
3.
G1/2 Hose inlet ( gas inlet)
4.
Metal clamp
5.
Gas hose (inner diameter 8mm)
ENGLISH
the

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis