Herunterladen Inhalt Inhalt Diese Seite drucken

aerex Reco-Boxx RB 300 Montage- Und Betriebsanleitung Seite 86

Vorschau ausblenden Andere Handbücher für Reco-Boxx RB 300:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Connection option 6:
Ventilation unit+ Room air control +
Electrical air heater. Refer also to the
wiring diagram in the appendix.
If the heat recovery unit is installed in a
passive-energy house, pre-heating
(Preheating register) of the outside air is
necessary, in order to guarantee a
permanent air exchange.
It warms up cold outside air and keeps the
heat exchanger free of frost. The switch-on
temperature of the TH 10 should be set to
-3 °C.
Connection plan
RB... Ventilation unit
AB
Exhaust air
AU
Outside air
ZU
Supply air
FO
Outgoing air
R1
Temperature sensor
ERH
Electric air heater
(preheating register)
S1
Air flow monitor sensor
84
If the outside air temperature gets too cold,
the external frost protection heating of the
ERH 16-2 switches on and protects the
RB 300/RB 400 heat exchanger against
icing up.
The switch-off difference should be set to 5 K.
Optionally, the switch-on temperature can be
adjusted manually using the setting wheel at
the TH 10.
The minimum distance for S1
i
and R1 must be maintained.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Reco-boxx rb 400

Inhaltsverzeichnis