Herunterladen Inhalt Inhalt Diese Seite drucken

Equipment Setup And Use; Prior To Use; Setup - Siemens AMATECH Cysto Lift Knee Crutch Gebrauchsanweisung

Version b
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 36
INSTRUCTIONS FOR USE
3

Equipment Setup and Use:

Prior to use:

a. Inspect the product looking for any visible damage or sharp edges that could
be caused by a drop or impact during storage.
b. Make sure product has been properly cleaned and disinfected and wiped dry
prior to each use.

Setup:

a. Place patient on table in a comfortable position.
b. Mount the Cysto-Lift Knee Crutch into the supplied clamps. Locate these
clamps adjacent to the patient's hip joint.
c. Mount the Knee Crutch into the clamps. Locate these clamps adjacent to the
patient's hip joint.
d. Place Knee Crutch into the desired amount of abduction and then lock clamps
securely into place, by tightening knob 1.
e. Once the Knee Crutches are located approximately to the desired position of
the patient's calves, tighten knob 2.
f. Ensure that the Knee Crutch pads are in place and arranged properly. The Knee
Crutch straps should be out of the way.
Document Number: 80028306
Version: B
Page 12
Issue Date: 19 MAR 2020
Ref Blank Template: 80025118 Ver. E

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

I-clksmns

Inhaltsverzeichnis