Herunterladen Inhalt Inhalt Diese Seite drucken

Customer Service; Safety Advice; Before Assembly - Palram Mythos Gebrauchsanweisung

Vorschau ausblenden Andere Handbücher für Mythos:
Inhaltsverzeichnis

Werbung

-
-
-.1
-
-
-
'
"
'
Customer
Service
For
assistance
with
assembly or for replacement parts
-
please log
onto our website
or
call
our service line (number
is
on
the title
page).
Additional information
can be
found
at
our website:
www.palramapplications.com
Safety Advice
It
is
of utmost importance
to assemble
all
of the
parts
according to the directions.
Do
not
skip any step.
We
strongly recommend
using
work
gloves
during
assembly.
Always wear shoes and safety
goggles when working with extruded aluminium.
If using
a
step ladder or
power tools
ensure
that
you
follow the manufacturer's
safety advice.
Do
not touch overhead power
cables
with the aluminium
profiles.
Do
not attempt to
assemble
the greenhouse
in
windy
or
wet conditions.
Dispose
of
all
plastic bags safely keep
them out of
reach
of
small
children.
Keep
children away from the assembly
area.
Do
not
lean
against or push
the greenhouse during construction.
Do
not position your greenhouse
in an area
exposed to excessive wind.
Do
not attempt to
assemble this greenhouse if you
are
tired, have taken drugs or
alcohol or if you
are
prone to dizzy
spell.
Hot items
such
as
recently
used grills,
blowtorches
etc.
must
not
be stored
in
the
greenhouse.
Ensure
there
are
no
hidden
pipes or cables
in
the ground before
inserting the
pegs.
This
product
is
designed to
use
as
greenhouse
only.
Care &
Maintenance
When your greenhouse needs to be cleaned,
use
a
mild detergent solution and rinse with
cold clean water.
DO NOT use
acetone, abrasive cleaners or
other
special
detergents to
clean
the
clear panels.
It
is
recommended to check periodically that
roof panels'
caps (plastic
part
329
&
profile
981) are set
in
place.
Tools
&
Equipment
Tape measure
Large
hammer
Work gloves
Spanner
Lubricant
T001
-
Special
tool for
Screws
411
and nuts 412
Phillips head screwdriver
Step ladder
Drill
bit
Ii
30
Before
Assembly
This
is
a
multi-part
assembly best
achieved by
two
people. Allow
at least
half
a
day for assembly process.
Selecting
a
site
-
the greenhouse must
be
assembeld,
positioned
and fixed on
a
flat
level surface.
Choose
a
sunny position away from
overhanging
trees.
We are
strongly recomend to fix your
greenhouse directly to
a
solid
concrete
foundation.
When doing that
use
the
pre
drilled
holes
in
the
metal
base
supplied.
Take
out
all
components
parts
of
the
packages. Sort
the
parts and check
against the contents parts
list.
During assembly parts should
be laid
out
close at hand. Keep
all
small parts (screws
etc.)
in
a
bowl
so
they
do
not get
lost.
In
purpose to facilitate parts' identification
and assembly process,
all-positioned
profiles
are
used
in
this greenhouse.
As
a
result some apertures
in
the profiles
are
not
used
during
assembly.
.
-5
-
A
. -
-
.
-
"
'
During Assembly
Carry
out the
assembly steps
in
the order
set
out
in
the instructions.
You
may
use
Silicon
lubricant
spray
in
order to
help you slide the profiles
on
the connectors.
Do
not
spray
the Polycarbonate
panels.
Use
the rubber malet
if necessary.
Step
1: Make sure
the
base
is
square by
measuring the diagonals and
level
by using
a
spirit
level.
Step
5:
Part
A994, A995
are
in
the back of the
greenhouse. Fixing them determines the front
side
of the greenhouse.
Steps 8, 10, 15:
The oval
hole
in
the
crossbars
A256
should
always be assembled
to the
base
of the greenhouse.
Door assembly (Steps
9,
56-62)
Door
can be installed
as
a
left hand
door
or
right
hand
door to your decision.These instructions
show
a
right hand door
assembly.
Step
9: determines door direction door post
987
is
where door hinges will
be located.
Steps 56-62: Door assembly should
be
done
according to this decision.
Step 42:
Decide on the window's location
before assembly.
Window
can be
installed
in
one of the indicated options.
Step 55
:
In
case
the
window
is
not closed
properly, please release
the
screws,
adjust the
profile and
tighten the
screw.
Step 68:
Firmly
connect the greenhouse to
a
level
final position
immediately
after
completion
of the
assembly.
Tighten
all
screws
when completing
assembly.
Ile
.
-
OS
"
"'
-
5-
.
Ile
-
-
-9
-
-
--le-.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis