Herunterladen Inhalt Inhalt Diese Seite drucken

Perel EVM831 Bedienungsanleitung Seite 7

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 45
Warning:
This device wa
s designed in accorda
This implies th
at certain restrictions
which can occu
ur within the environm
This d
device is only suitab
degre
ee class 2 environme
6. Descript
tion of the Front
Refer to the illu
ustration on page 2 of
Selection swi
tch: the meter has m
Always r
remove the test probe
function o
or range!
To switch
h off the meter, set th
"10A" JACK:
"COM" JACK:
"VΩmA" JACK
K: Connect the red tes
7. Operatin
ng instructions
Risk
of electric shock du
meas
suring live circuits.
Befor
re measuring, always
not d
damaged and verify th
• Never excee
ed the limit value for p
separately i
n the specifications fo
• Do not touc
h unused terminals w
being tested
d.
• Only use the
e meter in the indicate
measure vo
ltages that might exce
• Disconnect t
the test leads from th
selector in o
order to change functi
• When carryi
ing out measurements
always reme
ember that high ampl
damage the
e meter.
• Always be c
areful when working w
Keep your fi
ingers behind the pro
• Do not mea
sure current in circuit
• Never perfo
rm resistance, diode o
Make sure a
all capacitors in the cir
• When the di
isplay indicates "OL" d
is higher tha
an the currently manu
• When a low
voltage range is selec
reading alth
hough the leads are no
normal and
is caused by the high
and give a p
proper measurement w
28.04.2010
selected via the
Connect the red tes
> 200mA
Connect the black t
except current mea
EVM831
ance with EN 61010-1
in use apply that are
ment of use. Refer to t
ble for measuremen
ents.
Panel
f this manual.
multiple functions and
selection switch.
es from the ciruit befo
e selection switch to O
st lead to this jack for
test lead to this jack
st lead to this jack for
asurements > 200mA
uring operation. Be
make sure the meter
he connections, selecte
protection. This limit v
or each range of meas
hen the meter is linke
ed overvoltage/install
eed the indicated cate
e tested circuit before
ons.
s on a TV set or switc
itude voltage pulses a
with voltages above 6
be barriers at all time
s with voltages > 250
or continuity measure
rcuit are discharged.
during a measuremen
ually selected range. S
cted, the display may
ot connected to a dev
h input sensitivity. The
when connected to a c
7
pollution degree 2.
related to pollution
the table above.
nts in Pollution
ranges that can be
ore selecting a differen
OFF.
r current measuremen
r all measurements
very careful when
and/or test probes ar
ed function and range
value is listed
surement.
ed to a circuit which is
ation category. Never
egory values.
e rotating the range
hing power circuits,
at the test points migh
60Vdc or 30Vac rms.
es during measuremen
0V
ements on live circuits
t, the measured value
Select a higher range.
show a varying
ice or circuit. This is
e reading will stabilize
circuit.
©Velleman nv
.
nt
nts
re
e.
s
r
ht
nt.
s.
e
v

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis