Herunterladen Inhalt Inhalt Diese Seite drucken

Trial After Installation - Peraqua 7301269 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

1. Wiring diagram
A. For power supply: 230V 50Hz
Distribution Box (Customer prepare)
Power Supply
230V 50Hz
Earthing
Must be hard wired, no plug allowed.
For your safe use in winter, it's strongly recommended to equip heating priority function.
For the detailed wiring diagram, please refer to Appendix 1.
2.Options for protecting devices and cable specification
Breaker
Power Cord(mm
Signal cable(mm
NOTE: The above data is adapted to power cord ≤ 10m. If power cord is >10m, wire diameter must be
increased. The signal cable can be extended to 50m at most.

2.3. Trial after installation

Please check all the wirings carefully before turning on the heat pump.
2.3.1.Inspection before use
 Check installation of the whole heat pump and the pipe connections according to the pipe
connecting drawing;
 Check the electric wiring according to the electrical wiring diagram and earthing
connection;
 Make sure that the main power is well connected;
 Check if there is any obstacle in front of the air inlet and outlet of the heat pump
2.3.2.Trial
 The user is advised to start the water pump before the heat pump, and turn off the heat
pump before the water pump for long life circle.
 The user should start the water pump, and check for any leakage of water; Power on and
press the ON/OFF button of the heat pump, and set desired temperature in the
thermostat.
 In order to protect the heat pump, the heat pump is equipped with start delay
Fuse
Breaker
MODEL
Rated Current A
Rated Residual
Action Current mA
Fuse
A
2
2
For installers and professionals
Swimming Pool Heat Pump Wiring Board
Power Cord
7301269
7301270
15.0
19.0
30
30
15.0
19.0
3×2.5
3×4
3×0.5
3×0.5
- 14 -
7301271
7301272
22.5
25.5
30
30
22.5
25.5
3×4
3×6
3×0.5
3×0.5

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

730127073012717301272

Inhaltsverzeichnis