Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Warnings; Safety Warnings; Product Installation; Connection Examples - Fracarro SIG9708CI Betriebsanleitung

Vorschau ausblenden Andere Handbücher für SIG9708CI:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 68
The product must be installed only by qualified persons, according to the local safety standards and
regulations. It is classified as Class II, in accordance with EN 60065 and, for this reason, it shall not be
connect to the protective earth (PE) of the supply mains.

Installation warnings

Use only the original power cable, installing the product so that the mains plug is easily accessible.
The product must not be exposed to dripping or splashing and thus it shall be installed indoors, in
a dry place.
Don't install the product above or close to heat sources, in dusty places or where it might come into
contact with corrosive substances.
Leave some space around the product housing (at least 8 cm over and under) to ensure sufficient
ventilation; an excessive operating temperature and/or an excessive heating may affect the
performance and the life of the product
To prevent injury, this product must be securely attached to the wall, on the floor or in a rack in
accordance with the mounting instructions given on Chapter . PRODUCT INSTALLATION.
In accordance with the European Directive 004/108/EC (EMC), the product shall be installed using
devices, cables and connectors that allow to comply with this directive requirements for fixed
installations.
Earthing of the antenna system
The product must be connected to the earth electrode of the antenna system, in accordance with
standard EN 5008-1, section 10. The screw to be used for this scope is marked with the symbol
. It is recommended to follow the provisions of EN 5008-1 and not to connect the screw to the
protective earth (PE) of the supply mains.
IMPORTANT: Open the cover only for audio and video regulation and for insertion and removal of the
CAM modules or the single receivers; therefore, never do any operation on the internal circuits of the
product and, in particular, never remove the metal cover, which protects the main power supply section
(left side), to avoid the access to hazardous voltage parts. Only instructed and authorized persons can
open the product. In case of failure, do not try to repair the product; otherwise the guarantee will no
longer be valid.
The headend has to be installed by using the supplied brackets and screw. Take the assembling brackets
out from the package and pull the headend out. Some holes are present on the filling cardboard to show
the position of the bracket holes. This cardboard can be used to mark the position on the wall where
drilling the holes for the screws. Install the brackets by referring to Figure , if the unit will be installed
on the floor; refer to Figure 4, if the unit is installed on the wall. Leave enough room to disconnect the
supply cable and open the front panel.
It is also possible to install the headend on the 19" rack cabinets (see Fig. 5), see your Fracarro catalogue
for information relevant to be used and cabinet size.
Install the headend, following the above-mentioned figures; any other type of installation can compromise
the headend operation.
NOTE: we recommend that you take note of the key code on the front panel in the event that the
key is lost.
The receivers can be connected to a universal converter (LNB) by using external splitters, if necessary,
to divide the signal (see Fig. 8 as an example). To use headend, if you use more than one receiver for
the same polarization with universal LNB, only one module must power the LNB. If you do not need
this warning, the images could freeze. Use a (LNB) converter with 4 H/V separate outputs to connect
the multi-switches and refer to Figure 9.
NOTE: the total maximum current of remote power supply is 400mA (@ 14V).

SAFETY WARNINGS

1.

2. PRODUCT INSTALLATION

2.1 CONNECTION EXAMPLES

0

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis