Herunterladen Inhalt Inhalt Diese Seite drucken

Before You Start - X-METAL 11356 Aufbauanleitung

Metallgartenhaus in holzoptik 13,6m2 + verankerungskit
Inhaltsverzeichnis

Werbung

BEFORE YOU START

OWNER'S MANUAL
Prior to installation, it is important that you contact your local government authority to determine if building approval
is required. Study and understand this owner's manual. Important information and helpful tips will make your
construction easier and more enjoyable.
ASSEMBLY INSTRUCTIONS
Instructions are supplied in this manual and contain all appropriate information for your building model. Review all
instructions before you begin. During assembly, follow the step sequence carefully for correct results. Please be
aware: this unit takes two people about one full day to complete.
PARTS
• Check to be sure that you have all the necessary parts for the building.
• Separate contents of the carton by the part number while reviewing parts list.
• Familiarize yourself with the hardware and fasteners for easier use during construction. These are packaged within
the carton. Note that extra fasteners have been supplied for your convenience.
TOOLS MAY REQUIRED
Use heavy duty gloves
when handling steel
sheets and flashing.
PLANIFICATION
WATCH THE WEATHER
Please be sure the day you select for installation is dry and calm. DO NOT attempt
to assemble your shed in windy weatherbecause of risk of damage to panels, or
personal injury. Be careful of wet or muddy ground.
TEAMWORK
Whenever possible, two or more people should work together to assemble
the building. One person can position parts or panelswhile the other is able to
handle the fasteners and the tools. It requires two people a full day to complete
installation.
SITE SELECTION
Avoid overhanging trees as much as possible as leaves will make regular cleaning necessary and broken branches are
a potential hazard. Small trees, bushes or fences nearby can be helpful, acting as a wind break.
4
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis