Herunterladen Diese Seite drucken

nVent RAYCHEM RMM2-E Installationsanleitung Seite 5

Externes beheizungs-überwachungsmodul
Verfügbare Sprachen

Verfügbare Sprachen

B. Connect power and earth wiring and select voltage
operating range
3. Select the voltage operating range
Connect the supplied wire jumpers to the appropriate terminals
to select input voltage.The RMM2-E is supplied jumpered for 230
volts.
4. Connect wiring from power source to
designated terminals on RMM2-E.
Use only copper conductors. Connect power cable wires to the
terminals marked L1 and L2 on the RMM2-E. If power is being
daisy chained, be sure to maintain polarity of L1 and L2 wiring
for incoming and outgoing wires. The terminals accept stranded
wires from 0.2 – 2,5 mm
. (0,2 - 4 mm
2
5. Connect earth wiring.
Connect the earth wire(s) to the earth terminals mounted on the
DIN rail. The terminals accept 0,8 - 2,5 mm
wires.
C. Connect RTD Cables to the RMM2-E
The RMM2-E has terminals for 8 three-wire, RTDs (Pt 100
temperature sensors, to IEC 751); do not use other types of RTDs.
Select RTDs appropriate for the usage:
MONI-PT100-NH
Temperature sensor for
non-hazardous areas
MONI-PT100-EXE
Temperature sensor for hazardous areas
Install each RTD in accordance with the installation instructions
shipped with it, and run the RTD lead wires to the RMM2-E.
Note: Resistance of lead wires from each RTD must not exceed
20 Ω (e.g. 150 m with 3 x 1,5 mm
solid wire)
2
solid or stranded
2
cable).
2
3
0
Jumpered
for 115V
2
0
0
8
nVent.com/RAYCHEM
EN
DE
FR
RU
Jumpered
for 115V
|
5
loading