Stick insulation material over the entire surface between
the corner posts of the modules. This must overlap with
the prefabricated insulation material. The pre-cut strips
are included in the scope of delivery.
Attach the side tunnel to the wall. The side tunnel can
now be screwed either to the panel or the extra stud
wall depending on the specification.
Now the electrical connection can be made using the
CEE link cable (included in the scope of delivery
depending on the version). For internal power links
(no CEE connectors on the outside), see the circuit
diagrams inside the unit.
In addition, the special PLUS Line clamping wedge
must be inserted at the required support points.
Before the side tunnel covers can be installed,
the spaces to the left and right of the already fitted
insulation material must be filled with rock wool up to
the ceiling. This is included in the scope of delivery.
ATTENTION: This step is only necessary when
having units with additional stud wall, otherwise it is
preassembled.
Depending on the specification, the edge seal profile
must be attached to the end of the side tunnel. Alter-
natively, both ends can be finished with silicone (on
site).
When stacking additional storeys, only the special
PLUS Line stacking cones must be used in the corners.
Establish earthing of the module via the specified point.