Herunterladen Inhalt Inhalt Diese Seite drucken

Shuoqi GH-709 Montageanleitung Seite 10

Vorschau ausblenden Andere Handbücher für GH-709:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 12
INSTALLATION STEPS
INSTALL PEDAL
1. First take the thread of pedal L to direct vertically to crank L, then firmlyfix
the pedal marked L to the crank arm marked L in a anti- clockwisedirection
until tight.
2. Now take the thread of pedal R to direct vertically to crank R, then firmlyfix
the pedal marked R to the crank arm marked R in a clockwise directionuntil
tight.Remarks: failure to follow the above instructions could result in damage
to thecranks and pedals.
INSTALL THE KETTLE
Screw out the screws fixed on the frame with a Allen wrench, place the bottle
holder (19) on the frame of the exercise bike, and tighten the screws with
Allenwrench (27).
19
27
8

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis