Herunterladen Inhalt Inhalt Diese Seite drucken

List Of Main Parts; Putting Into Operation; Switching On - ekwb EK-Loop Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 15
2
1
5
7
3
6
4
FIG. 1
FIG. 2

LIST OF MAIN PARTS

Position Description
1
Heat nozzle
2
Heat protection collar
3
Air intake openings
4
Main switch
Display with temperature rating in
5
colored increments
Button for decreasing
6
temperature
Button for increasing
7
temperature

PUTTING INTO OPERATION

Observe the mains voltage: The voltage of
the power source must agree with the value
given on the nameplate of the unit. Extension
cords must have a conductor cross section
of 2×1.5mm² min.
Before connecting the plug to the mains
voltage you have to check if the switch is in
position "0". (FIG. 1)

SWITCHING ON

Select the required operating temperature
and air volume with switch position I. (FIG. 2)
- 4 -

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis