Assembly and operating instructions EEM400C-D-MO
Three-phase active power energy meter with serial Modbus interface, Pic. 1
Description
Energy meter with serial Modbus interface enables the
reading of all relevant data like meter reading, electricity,
voltage and power (active and reactive).
Technical data
Connection
■
Pic. 2
diagram
Dimensions
■
Pic. 3
Accuracy class
B according to EN50470-3,
■
1 according to IEC62053-21
Reference, Maxi-
■
I
= 5 A, Ima
ref
mum, initial current
operating voltage
■
3 × 230/400 V
Tolerance –20 %/+15 %
Counting range
000 000,0...9 999 999 kWh
■
LED-Ouptut
10 Imp/kWh
■
Connections
Conductor cross-section 1,5 - 16 mm
■
Main circuit
screwdriver pozi no. 1, slot no. 2,
torque 1,5 - 2 Nm
Connections
Conductor cross-section max. 2,5 mm
■
Control circuit
screwdriver pozi no. 0, slot no. 2,
torque 0,8 Nm
Operating
■
–25 ...+55° C (noncondensing
temperature
according standard EN50470)
Environment
Mechanical M2
■
Electromagnetic E2
Indicating elements
(Pic. 4)
Shows total consumption
T1total (kWh)
■
Shows partial consumption,
T1part. (kWh)
■
this value is resettable
CT
Shows the sett
■
current transformer ratio
Select
The transformer ratio can be
■
selected in Menu item Select, in
the open bridge Z1-Z2
Shows the instantaneous power
P (kW)
■
per phase or all phases
Shows the voltage per phase
U (V)
■
Shows the current per phase
I (A)
■
Shows the unit kWh when the
kWh
■
consumption is displayed
For P-, U-, I- or Error display, the
L1 / L2 / L3
■
corresponding phase is displayed
In case of missing phase or wrong
Error
■
current direction. The corresponding
phase is additionally displayed.
Notes before connecting
1. Do not connect L1, L2 or L3 to N
2. In order to avoid moisture in the meter due to
3. N must always be connected.
Attention!
These devices must only be installed by a professional
electrician, otherwise there is the risk of fire or the risk of
an electric shock.
Wiring diagram
6 A, Ist = 10 mA
x =
, 50 Hz
AC
This connection is to be fused according to the local instal-
lation instructions.
,
2
Operation of the LCD display
,
2
See page with LCD menu navigation.
The bridge Z1-Z2 should be removed for adjusting the
transformer ratio.
Installation instructions
The three-phase energy meter can be attached to a 35 mm
rail (EN60715TH35).
The meter can be used only in installation cabinets.
Declaration of Conformity CE
We, Honeywell Technologies Sàrl, 1180 Rolle, herewith
declare, on our own responsibility that the product:
which this certificate refer to, are in accordance with the
directive 2004/22/EG (MID) and the following standards:
Murten, 30.04.2013
Conformity Assessment Body:
Signed:
condensate build-up, acclimatise the meter at room
temperature for about half an hour before connecting.
The secondary, mains current transformer con-
nection is to be connected to the phase to be
measured and therefore the transformer don't
have to be grounded.
EEM400C-D-MO-MID
■
EN50470 parts 1 and 3 (electronic meter), of
■
October 2006.
METAS-Cert, Nr. 1259
CH-3003 Bern-Wabern
Urs Tanner, Site Quality Leader