Fine fissures
The building material around the fireplace can move.
In new houses in particular, it is common for building
materials to settle substantially in the early years. In
addition, all concrete elements shrink to a decreasing
extent for up to 15 months. The result is that small
cracks may appear in the concrete/masonry.
Use the fireplace for a few months. If cracks appear,
scrape them out with a screwdriver or similar (to provide
more space for acrylic joint filler). Vacuum the surfaces
to remove any dust.
Inject acrylic joint filler and even it out with a spatula or
a finger wetted with soapy water.
The joint can be painted after a couple of days
Painting
When the fireplace has been filled/sanded and the
glued joints are dry, the fireplace is ready to be painted.
Use only breathable paint (acrylic) intended for
masonry.
Marble/granite
Clean the plates with mild soapy water and remove any
residue of spilled glue.
Never use acid/abrasive materials, as this will damage
the surface and polishing.
It is important to use detergent/sealant that is approved
for marble for cleaning and sealing.
Scratches in dark marble can be coloured with a pencil.
A professional stone centre can help you with different
products for surface treatment of the stone
For your own safety, comply with the assembly
instructions. All safety distances are minimum distances.
Installation of the insert must comply with the rules and
regulations of the country where installed. Nordpeis AS
is not responsible for wrongly assembled inserts.
We accept no liability for typographical errors and
changes.
NB! See separate instructions for the insert
Davos U High
Insert
N-29U
Steel chimney
Can be connected to steel chimney.
with steel chimney we also require that a connected vented
chimney is used or that it is equipped with minimum 60mm
insulation in case of unvented chimney.
Weight including insert
Davos U High + N-29U
Floorplate
Please follow the rules and regulations regarding
floorplates in your country.
Minimum measurements firewall
Davos U High has an integrated firewall and can be
mounted directly against a combustible wall. Make sure
to follow the rules regarding insulation of the smoke pipe
in your contry.
Safety Distances (FIG 2)
Ensure that the safety distances are complied with.
Please note that these safety distances can vary from
country to country.
Illustration (FIG 1)
The illustration indicates the approximate centre height
of the hole for the flue. Consider possible inclination of
the flue prior to perforating the chimney. Distortions in
floors and walls may influence the height. Dry stack
the fireplace for accurate height and positioning of
the flue/chimney connection. If a fresh air supply set
(accessory) is connected through the floor, prepare the
bottom element before assembly.
Fresh air supply (accessory)
ATTENTION! The product can only be connected to
the fresh air supply through the pre cut areas in the
surround (See FIG 1) . Seal off the gap between the fresh
air hose and the concrete with a non combustible seal-
ant, Rockwool etc.
For more information see separate assembly
instructions for fresh air supply.
GB
When top mounted
430 kg
7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis