Herunterladen Inhalt Inhalt Diese Seite drucken

Yalp Solar YA 3200 Installationsanweisungen Seite 35

Vorschau ausblenden Andere Handbücher für Solar YA 3200:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

UNINCLUDED MATERIAL
Description
Transport
Pallet lifter
Installation tools
Fork spanner
Fork spanner
Fork spanner
Hex key
Hex key
Hex key
Shovel
Wire stripper
Flat screwdriver(insulated)
Stanley knife
Measuring tape
Conduit (depending on distance Solar and interactive)
Leveller
Pozidriv head screwdriver (for transport box)
Phillips head screwdriver (for power box)
Deep mount
Quick drying concrete (C20/C25 NEN -EN206-1/-8005)
Surface mount
Rotary hammer
Drill bit advised for chemical anchor (e.g. M20 Hilti)
Quick drying concrete (C20/C25 NEN -EN206-1/-8005)
Chemical anchor (4000N) e.g. Hilti HIT 170 with 8.8
anchor M20 (in combination with C20/C25 concrete)
Concrete cutter
In case of limited tilting space
Crane
Lifting belt
A. PREPARATION
A.1 Transportation advice
Metric
13 mm
19 mm
24 mm
3 mm
6 mm
8 mm
-
-
-
-
-
Ø0,32 mm
-
PZ2
PH2
1250 kg
-
-
100 - 250 kg
-
-
-
-
WARNING Not taking the right precautions
could result in accidents and/or damage.
35
Imperial
1/4
3/4
15/16
1/8
1/4
5/16
-
-
-
-
-
(ر0.13")
-
-
-
2756 lbs
-
-
220-551 lbs
-
-
-
-
YA3200-210723
EN
EN
NL
DE
FR

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis