5.7.1

Power supply control unit

Use the wiring diagram corresponding to your product.
Verify that the product is connected to mains by means of a suitable,
permanently installed cable (for example, NYM-J 3 x 1.5 mm²).
Verify that the power supply to the control unit is separately fused (16 A
maximum).
1. Open the control unit.
2. In the case of OM 5 and OM 5+1, route the mains cable through the
cable gland at the left into the control unit.
3. In the case of OM 1, route the mains cable through the cable gland at
the right into the control unit.
4. Connect the phase to terminal L and the neutral conductor to terminal
N.
- The protective ground conductor (PE) does not have to be connected.
Fig. 6: Electrical connection OM 5
Mounting
1. Supply voltage
2. Any external equipment
3. Green
4. Brown
5. White
6. Probe 1
7. Probe 2
8. Probe 5
F1 mains fuse