Herunterladen Inhalt Inhalt Diese Seite drucken

Replacing The Capacity Kit - Siemens Wallace & Tiernan Chem-Ad VPP Betriebsanleitung

Schlauch-dosierpumpen
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6.
Maintenance
Removing the capacity kit
Installing the capacity kit
76
6.2

Replacing the capacity kit

Attention!
Always empty the pump hose, supply line and discharge line first,
and rinse with water.
Never grease pump hoses!
Attention!
Danger of electrical current and sudden activation of the pump
(risk of pinching):
Ensure that the peristaltic metering pump remains disconnected
from the supply voltage during maintenance.
Attention!
For reasons of safety, only use original spare parts. Please contact
our customer service department if you need any spare parts.
1 There are two notches, each approx. 9 mm long, on the inside
of the front housing cover near the hose outlets. Carefully lift
up the front housing cover with a screwdriver on the notches
and lift off by hand.
2 Lift and remove the transparent cover.
3 Remove the blue rotor cap from the rotor.
4 Remove the capacity kit including pump hose from the
peristaltic metering pump housing, turning the rotor clockwise
by hand.
5 Push the capacity kit into the mount.
6 Turn the rotor clockwise by hand and place the pump hose
into the pump track slot.
7 Refit the blue rotor cap.
8 Snap on the peristaltic metering pump housing cover.
9 Fit the front housing cover and press firmly into place.
Chem-Ad
®
VPP / VPP-E / VPP-DC
WT.490.250.000.DM.IM.0911

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis