• Installation should be carried out in accordance with the relevant refrigeration and electrical standards which apply
in that country. Refrigeration best practice must be followed.
• EMBRACO shall not under any circumstances be liable if the installation and maintenance are not carried out in
accordance with the instructions given in this manual.
1.4 Cautions
• Units in the application must be used within a working range specified by manufacturer.
• Refrigerant going into suction line must be in vapor stage.
• Give special attention to the correct welding or other forms of connecting joints in the system to avoid the
possibility of leaks.
• Use a leak detector suitable for the respective refrigerant to guarantee the maximum efficiency in controlling leaks.
• Avoid damaging of the Unit label during the assembly process.
• Good refrigeration practice suggests system evacuation from both the low and the high side, achieving a minimum
level of 0,14 mbar.
• Use the Unit only with electrical components specified by the manufacturer. The electrical box of the compressor
should be located in a position where a safe distance from any plastic, foam, wire or any other flammable material is
ensured. The electrical box should not be placed close to any water tray, close to insulation of suction tubes or close
to electrical connections or application wiring.
Read carefully the following instructions before assembly and putting into operation this Unit.

2. TECHNICAL DATA

2.1 Identification label Always check if the label corresponds to the required model to be installed.
2.2 IP protection
Unit protection degree is IP44.
2.3 Safety devices. All Units are supplied with an adjustable LP and adjustable or fixed HP pressure switch. Pre-
setting from factory:
Refrigerant
R404A, R449A, R452A, R448A
R134a, R513A

3. INSTALLATION

3.1 Unpacking
Before unpacking the Unit, check that the packaging has not been damaged in any way and that the exterior is in
good conditions.
3.2 Handling
The packaged Unit can be lifted by forklift or pallet truck. The Unit should therefore be kept in its packaging until it
has been moved to the installation site. Once the packaging has been removed, the Unit can be moved
Warning
: Do not lift or move the product by its housing when opening it.
3.3 Location
Ensure the Unit should not block or obstruct thoroughfares, doors, shutters or the movement of personnel.
The surface supporting the Unit must be leveled and capable of bearing the combined weight of the Unit and
support.
Ensure there is a sufficient distance between the Unit and object in surrounding area to ensure proper air circulation
(refer to picture 3).
Unit must be installed in well ventilated area but not windy locations. Ensure there is a good air circulation to the
condenser. There must be no obstacles in front or on the side of the Unit which would cause air recirculation to the
condenser resulting in an abnormally high condensing temperature.
HP (MPa / PSIG)
Differential (MPa)
2.8 / 400
1.7 / 250
3
LP (MPa) /
0.2 / 0.15
0.2 / 0.15