Herunterladen Inhalt Inhalt Diese Seite drucken

Operating Conditions; Preventive Maintenance - SUHNER ABRASIVE LWA 70-KF Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 12

2.4 Operating conditions

Temperature range during operation: 0 to +40°C
Relative air humidity: 95% at +10°C not condensed
3.
haNDLINg
3.1 Tools
Use only clean tools!
3.1.1 Changing/Fitting the tool
Hold spindle by wrench flats with open end wrench and
release down screw with hexagon spanner.
Remove screw and washer.
Mount grinding tool and washer and fix again with screw.
3.1.2 Adjust the limit stop
/ o
PERaTIoN
Loosen hex socket.
Adjust the limit stop on the setscrew. Fasten with hex
socket.

4.1 Preventive maintenance

erating hours.
4. S
/ m
ERvICE
aINTENaNCE
Even if the machine still operates perfectly,
the motor should be removed and cleaned
by a specialist after approx. 300 to 400 op-
17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis