Herunterladen Inhalt Inhalt Diese Seite drucken

Installation - EuroLite STT-400/85 Bedienungsanleitung

Kurbelstativ
Vorschau ausblenden Andere Handbücher für STT-400/85:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The installation is only allowed on carrying areas. In some cases, an appropriate substructure, e.g. via an
balancing foot, has to be created.
When choosing the installation material, optimum dimensions have to be chosen in order to secure
maximum safety.
Never install any objects offering a large surface for winds (e.g. banners, signs, etc.).
The loads have to be installed in a balanced way.
Always fix the devices with an appropriate safety-rope.
Operate the stand only after having become familiar with its functions. Do not permit operation by persons
not qualified for operating the device. Most damages are the result of unprofessional operation!
The stand must never be moved before having lowered all telescopic tubes!
Never dismount the winch handle or any element of the winch under any circumstances.
Please consider that unauthorized modifications on the stand are forbidden due to safety reasons!
Never remove the serial barcode from the stand as this would make the guarantee void.
If this stand will be operated in any way different to the one described in this manual, the product may suffer
damages and the guarantee becomes void. Furthermore, any other operation may lead to dangers like
crash.
WEEE Directive
When to be definitively put out of operation, take the unit(s) to a local recycling plant for a disposal
which is not harmful to the environment. Do not dispose of as municipal waste. Contact your retailer or
local authorities for more information.

INSTALLATION

Please consider the
installation! The installation must only be carried out by an authorized dealer!
When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Before lifting or lowering the telescopic tubes, you must always block a safety area around the stand. This
safety area must have a diameter of 1.5 times the maximum height.
Procedure:
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the loads. If you lack these qualifications, do not attempt the installation yourself, but
DANGER TO LIFE!
DIN 15560-27
and the respective national norms during the
12/16
00031427, Version 1.2

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

5900704059007041

Inhaltsverzeichnis