Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Hoyer
®
English
Advance
6. Release the spreader bar from the retaining cradle. The lift is now ready for operation.

4. Disassembly

1. Lower the mast to the lowest possible position, then insert spreader bar into retaining cradle.
2. Release leg-locking device (pulling it away from the cast base), close legs tightly together.
7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis