Herunterladen Inhalt Inhalt Diese Seite drucken

Waterman IDEAL 20 L Montage- Und Bedienungsanleitung Seite 4

2-geteilte solardusche
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
4
ASSEMBLY INSTRUCTIONS
!
3 a
!
ASSEMBLY INSTRUCTIONS
Choose a location for the shower that provides as
much sunlight as possible.
1. Connect the shower head to the shower. DO NOT
use a screw wrench.
2. Install the foot of the shower on a solid surface
using four screws and dowels.
3. Place the sealing washer in the recess of the
lower part. Lift the top over the bottom of the
shower. Connect the inner hoses and tighten
FIRST USE OF THE SHOWER
1. Set the mixing valve to the hot position so that
no air bubbles remain in the shower when it is
filled. This is only necessary for the first filling.
2. Turn on the water supply of the garden hose to
fill the shower. It takes about 4-6 minutes for the
shower to fill.
3. Close the mixing valve as as soon as
water comes out of the shower head. Given
1a
Assembly and operating instructions solar showers Ideal 20 l
1b
3 b
them by hand. Turn the lock washer clockwise
so that the two parts are firmly connected.
Mixing valve and shower head must point in the
same direction.
4. Install the hose adapter on the shower.
5. Connect the garden hose to the hose adapter
and the water supply.
appropriate conditions, the water in the shower
will now warm up.
4. Depending on the amount of sunlight and the
outside temperature, the shower takes 2-3
hours to heat the water in the tank.
5. The water temperature can reach up to 60 ° C if
there is a high solar radiation.
2
4
5

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Waterman IDEAL 20 L

Inhaltsverzeichnis