Herunterladen Inhalt Inhalt Diese Seite drucken

Chauvet Professional GROUND SUPPORT 2 KIT Schnellanleitung Seite 7

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

7.
Place ballast weights (sandbags or steel weights) over the angling horizontal bars.
8.
Attach the F-series video panel to the rig bar panel by aligning the magnetic alignment conicals and locking the
male connection speegos.
9.
Insert the M12 panel attachment screws into the appropriate M12 threaded mounting hole.
M12 Panel
Attachment Screws
The F2 and F5IP video panels have frames with a center mounting position. The F3 video panel will
need the panel attachment screw inserted at the corner of the frame. Both the F4IP and Vivid 4 have
been upgraded with center mounting position frames, and may vary depending on order date.
Ground Support 2 Kit QRG Rev. 1
QUICK REFERENCE GUIDE
Video Panel
EN
6

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis