Herunterladen Inhalt Inhalt Diese Seite drucken

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Limited One Year Warranty
T&S warrants to the original purchaser (other than
for purposes of resale) that such product is free from
defects in material and workmanship for a period of
one (1) year from the date of purchase. During this
one-year warranty period, if the product is found to
be defective, T&S shall, at its options, repair and/
or replace it. To obtain warranty service, products
must be returned to...
T&S Brass and Bronze Works, Inc.
Attn: Warranty Repair Department
2 Saddleback Cove
Travelers Rest, SC 29690
Shipping, freight, insurance, and other transpor-
tation charges of the product to T&S and the return
of repaired or replaced product to the purchaser are
the responsibility of the purchaser. Repair and/or
replacement shall be made within a reasonable time
after receipt by T&S of the returned product. This
warranty does not cover Items which have received
secondary finishing or have been altered or modi-
fied after purchase, or for defects caused by physi-
cal abuse to or misuse of the product, or shipment
of the products.
Any express warranty not provided herein, and
any remedy for Breach of Contract which might arise,
is hereby excluded and disclaimed. Any implied
warranties of merchantability or fitness for a particu-
lar purpose are limited to one year in duration. Under
no circumstances shall T&S be liable for loss of
use or any special consequential costs, expenses
or damages.
Some states do not allow limitations on how long
and implied warranty lasts or the exclusion or limi-
tation of incidental or consequential damages, so
the above limitations or exclusions may not apply
to you. Specific rights under this warranty and other
rights vary from state to state.
P/N: 098-011395-45
Date: 980109
Drawn: CW
Checked: JLT 4-14-98
Approved: MW 4-14-98
Installation and
Maintenance
Instructions
PRE-RINSE UNIT
B-0131
(Also for B-0111, B-0121,
B-0141, B-0171)
Deutsch:
Installations- und
Wartungsanleitungen
Español:
la Instalación y las
Instrucciones de
Mantenimiento
Français:
les Instructions
d'Installation et
d'Entretien

Werbung

Inhaltsverzeichnis
loading

Inhaltszusammenfassung für T&S B-0131

  • Seite 1 Breach of Contract which might arise, is hereby excluded and disclaimed. Any implied warranties of merchantability or fitness for a particu- B-0131 lar purpose are limited to one year in duration. Under (Also for B-0111, B-0121, no circumstances shall T&S be liable for loss of...
  • Seite 2: Exploded View

    Exploded View hose washer wall...
  • Seite 3 002832-40 B-0141 B-0430 & B-0512 B-0171 002827-40 Asm, Finger Hook w/ screw 002873-40 Nipple 3/8"x26" (For B-0131 Only) 000373-40 3/8"x32 (For other Models) 000376-40 Wall Bracket (optional - not incl.) B-0109-01 Asm, "L" Tube 12" 002882-40 Body, Swivel Unit 3/8...
  • Seite 4: General Instructions

    General Instructions 6. Remove no.8 and no.9 from no.6. Installation: Riser & Apply teflon tape or pipe joint HoseAssembly compound to threaded end of no.8. See separate instructions for installing no.1 into deck. 1. Shut off water supply and drain lines.
  • Seite 5: Instrucciones Generales

    Instrucciones Generales Installación: Extensión & 6. Remueva las partes No.8 y No.9 de la parte No.6. Aplique cinta para Ensamble de manguera rosca de tubería o compuesto de Mire las instrucciones para la coyuntura al extremo con rosca de la instalación de la parte No.1 dentro parte No.8.
  • Seite 6: Instructions Générales

    Instructions Générales L’Installation: L’Assemblée 6. Enlever N°.8 et N°.9 de N°.6. D’Augmentation Et Du Tuyau Appliquer le ruban en Téflon ou le composé pour les tuyaux à l’extrémité Voir les instructions separées pour de N°.8 avec les filets. installer N°.1 dans l’égouttoir. 1.
  • Seite 7: Allgemeine Anleitungen

    Allgemeine Anleitungen 6. Nr.8 und Nr.9 von 6 entfernen. Installation: Teflonband oder Rohrkitt auf Zusammensetzung von Gewinde von Nr.8 schmieren. Steigleitung und Schlauch Teil 1 gemäß Anleitungen auf die Abdeckplatte montieren. 1. Wasser absperren und Wasserleitungen entleeren. 2. Teflonband oder Rohrkitt auf beide Enden von 3 auftragen.
  • Seite 8 RELATED T&S BRASS PRODUCT LINE B-0137 PRE-RINSE UNIT T&S BRASS AND BRONZE WORKS, INC. A firm commitment to application-engineered plumbing products 2 Saddleback Cove, P.O. Box 1088, T & S Brass-Europe Travelers Rest, SC 29690 ‘De Veenhoeve’ Phone: (864) 834-4102 Oude Nieuwveenseweg 84 Fax: (864) 834-3518...

Inhaltsverzeichnis