Herunterladen Inhalt Inhalt Diese Seite drucken

HJC i40 Bedienungsanleitungen Seite 6

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 11
Shield Installation
1. To install the shield, align the pivot posts while holding the shield in the open position.
2. Push each pivot hole onto the posts to snap in snap in place and rotate the shield forward into the fully closed position.
3. Place the shield side cover onto the shield and rotate it for locking.
4. Make sure of the secure locking between shield and cover.
Cheek Pad Removal
Cheek Pad Installation
1. Insert the plastic piece on cheekpad into the gap between shell and EPS liner.
2. Once fully inserted, button up all snap system after checking its correct position.
3. Make sure of secure placement and snap locking for use.
Crown Pad Removal
2. Repeat same at rear.
9
cident.
There are 2 snaps holding the cheek pad in place.
1. Gently remove the snap system from the chin strap cover.
2. Pull the cheekpad inward and free it from the assembly position inside.
Crown Pad Installation
1. Install the front section first by aligning the plastic shel
Sunlight Film Operation
Sunlight Film
Removal
1. Bring down the sunlight film.
2. Hold the helmet tight and pull the sunlight film away from the helmet.
3. Once a "click" is audible, the sunlight film is released from the helmet.
Sunlight Film
Installation
1. Lift the outer visor up.
2. Slide the sunlight film into the holder on both sides.
<Caution>
*Slide the sunlight film into the holder until a "click" is audible.
*The incorrect installation of the sunlight film may adversely
affect its performance.
astic sleeve (center portion) into the center of the channel
pair your vision and may lead to an accident.
.
clear visor is also in closed position
1. Above illustration shows raised sunlight film position.
2. Above illustration shows lowered sunlight film position.
er
10

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis